São Tomé Lembá Bridge Runs 1 Year Late Over Soil Tests
Published on: Monday 12 October 2026
The Lembá bridge in São Tomé and Príncipe is a year late after it was launched without soil studies; the World Bank-funded job now aims for 2027.